Electronic patient record
Unified history with clinical progress notes, prescribing and results available in real time.
The group ran separate systems per department, which fragmented the patient history exactly where continuity of care depends on it. One electronic patient record was built covering scheduling, bed management and pharmacy, exchanging data over HL7 FHIR with laboratories and existing systems, with role-based access, encryption and audit trails over sensitive health data.
Unified history with clinical progress notes, prescribing and results available in real time.
One diary across clinicians, rooms and equipment, which is what removes double booking.
Visual occupancy map including cleaning status, to shorten the gap between discharge and admission.
Batch and expiry traceability, dispensing tied to the prescription, and stock-out alerts.
Standard exchange with laboratories, devices and legacy systems instead of an adapter each.
Clinical and operational indicators for hospital management.
Role-based access, encryption and audit trails over sensitive data, tested from non-privileged accounts.
FHIR connection to systems the group kept, preserving prior investment.
Because point-to-point integrations compound. Each one is cheap to build and expensive to keep, and a hospital accumulates them until nobody can change a system without breaking three others. FHIR gives one exchange model that laboratories, devices and legacy systems already speak.
Access is granted through roles rather than to individuals, data is encrypted, and access and change are recorded in audit trails. Every control is then tested from a non-privileged account, because the most common finding in a review is a restriction that was configured correctly and never tried.
The architecture does; the compliance mapping has to be redone. FHIR, role-based access, encryption and audit trails are the same engineering. The obligations are not: UK work sits under UK GDPR and the Data Protection Act 2018, and NHS deployment adds its own information governance requirements that we would scope explicitly rather than assume.
Yes, and that was the deployment model here. Rollout ran department by department with FHIR integration to retained systems, so no single cutover was required and prior investment was preserved.
A 45-minute working session with an engineer rather than a sales call. You describe the problem; we set out what we would build, in what order, and what it is likely to cost.
Answered within one working day, by the engineer who would do the work